? Size: 195,000 Sq. Ft./18,000 m2
? 3 Large Drilling Machines for components up to 5 t
? 9 Machining Centers
? Annual Capacity:
190,000 Production Hours
? Size: 12,000 Sq. Ft./1,100 m2
? 2 Sub-Arc-Welding Machines for components up to 7t
? 2 Plasma-Arc Welding Machines
? 1 Orbital-Welding Machine
? 1 Welding Robot for Hard-Facing
? 5 Manual Welding Stations (GMAW, GTAW, SMAW)
? 7 Furnaces (gas- and electric fired furnaces, shaft furnaces)
? Annual Capacity:
23,000 Working Hours
? Size:
Assembly: 8,800 Sq. Ft./816 m2
Clean Condition Room: 2,300 Sq. Ft./216 m2
? Test Facility: up to a nominal size of 1.2 m and an overall length of 3 m valves are pressure and
tightness tested before leaving the factory
? Annual Capacity:
20,000 Valves